PROPOSED LEGISLATION IN NEED OF SUPPORT
In a previous post, I explained that the way Connecticut substitutes bonds for mechanic’s liens needs to be changed. I have now been honored to participate in a group that
In a previous post, I explained that the way Connecticut substitutes bonds for mechanic’s liens needs to be changed. I have now been honored to participate in a group that
In Girolametti v. Michael Horton Assocs., Inc., the Supreme Court determined when a subcontractor’s rights will be affected by an arbitration in which the subcontractor did not participate. Girolametti v.
At the outset, I want to stipulate that it is important to protect worker health and safety. At the end of the day, the most important thing is to have
The doctrine of substantial performance holds that a contractor’s breach of a construction contract does not entitle the owner to damages because the contractor’s performance was close enough to that